Commercial Construction

Best Western Plus
Leduc, Alberta

Goldwing Construction completed an interior and exterior renovation of all four floors of the Best Western Plus in Leduc, one floor at a time, while the hotel was still in use.  We constructed a new, ground up building addition complete with a swimming pool, hot tub and water slide. Additionally, the existing lounge and VLT bar was renovated and expanded while still in use complete with an outdoor patio and fireplace, overhead pergola and heating. 

Kingston Ross Pasnak
9888 Jasper, Edmonton
KRP is a 33,000 square foot high end office development on three floors of a downtown Edmonton office tower. This project featured a number of unusual elements including Teknion glass walls, inlaid wood ceiling panels, intricate millwork designs, fabric wall coverings and stainless steel features.
ISL Engineering and Land Services 
7909 - 51 Avenue, Edmonton

ISL Engineering and Land Services is a long term, repeat client of Goldwing Construction. The renovation of this two story office space incorporated some unique and high end finishes and was completed while the space was still being occupied. At Goldwing Construction we strive to accommodate the needs of our clients. The finished product is beautiful and modern.

Packrat Louie
10335 83 Avenue, Edmonton

The renovation of Packrat Louie encompassed both portions of the interior and exterior of the building. Due to the historical significance of the building collaboration with the design team and the City of Edmonton was paramount. The age of the building required considerable attention to detail and thinking "outside the box" to create a finished project that was beautiful. 

Kline Jeweler 
Fort Edmonton Park

This historical reconstruction was completed on behalf of the Jewish Archives and Historical Society of Edmonton. The H.B. Kline Jewelry Store was originally open some time between 1904 and 1908. Attention to  detail was crucial to ensure historical accuracy. Fabrication and installation of wooden millwork walls were just one of the intricate components of the project.

One of the additional challenges of this project was the frequent visits inside the building of the parks free roaming goats.  

Triple Flip 
West Edmonton Mall

The look of Triple Flip is quite unique and required several detailed and complicated components to fit together like a hand in a glove. The white laminate millwork "pod" clothing displays with curved edges and the millwork partition wall separating the retail space from the changing area are only two components of this project that were exciting and challenging.

Many of the pieces had to be fabricated off site then installed in the space ensuring everything would fit together perfectly.

O-Laff-O Fun House
Fort Edmonton Park
The O-Laff-O Fun House is located on the 1920's Midway area of Fort Edmonton Park. A more modern fun house was purchased and reconstructed to reflect the 1920's era. The fun house includes a mirror maze, turning barrels, and moving walkways.
A highly specialized team of carpenters was employed to create an experience to remember for visitors to the Fun House. 
As with all Goldwing Construction projects attention to safety was critical for this project.
Homes Alive 
Edmonton South, Alberta

This 23,160 square foot retail space is the second Homes Alive project completed by Goldwing Construction. This particular location required a complete sprinkler retrofit, had multiple structural components, new roof top units and all new finishes. 

Block 50 
Leduc, Alberta

Goldwing is helping our client with their vision to rebrand the downtown core of Leduc with this project through the creation of a pedestrian friendly district at 50th and 50th in Leduc.

Older commercial buildings were renovated and a 3200 square foot new commercial building with parking lots was constructed. 

Dispensaries Ltd. Compounding Center
Edmonton, Alberta

Dispensaries Ltd. creates customized medications from scratch to meet the individual needs of their clients. Goldwing Construction developed this state of the art compounding facility that met and in many cases far exceeded the stringent regulations for medical laboratories. This lab included sterile rooms, clean rooms, pressurized rooms and special air filtering equipment. Specialized epoxy paints, washable ceiling tiles and sheet flooring with heat welded seams were included in the finishes to maintain the cleanliness of the laboratory area.

Tetra Tech Consulting and Engineering Services
Edmonton, Alberta

Tetra Tech is a long term client of Goldwing Construction and they were confident in our skills to completely renovate two of their Edmonton offices while fully occupied. Goldwing coordinated and scheduled every aspect of the construction well in advance to prepare Tetra Tech staff for the construction. Goldwing also phased construction to allow moving of work areas and keep all Tetra Tech personnel working efficiently.

Fort Edmonton Park Fun House under construction