Projects
The Avenue at Hermitage
Infrastructure upgrades including underground utility coordination, water service enhancements, and full site restoration.
Jasper 111
Designing and implementing a modern storefront facade with curved metal panels, integrated lighting, enhanced glazing, and heavy steel arches.
Acumen Sports Clinic
This project involved transforming a commercial space into a specialized medical clinic offering physiotherapy, sports medicine, and patient rehabilitation services.
Boost Physiotherapy Clinic
Tenant improvement build-out located within the Terwillegar Community Recreation Center in Edmonton, Alberta.
Rock Lake Bridge
Goldwing provided a durable and environmentally sensitive bridge structure to improve trail connectivity and public access.
Kingston Ross Pasnak
Interior renovation of a three floor high-end office space. Work completed on time and included custom millwork, Teknion walls, and premium finishes in lounges, meeting rooms, and a bistro.
Amadeus Music
exterior upgrades including new Lux siding panels, architectural façade enhancements, lighting, and minor landscaping.
Schrader Building
Construction of a new standalone 3,000 sq. ft. building in Leduc, AB. The project included the interior build-out of a craft brewery and restaurant for owner Lynn Schrader.
WestPoint Building 8
Project included enhanced pile design due to poor soil and winter construction with heating and hoarding. Tenants now include a dentist and fast food restaurants.
Homes Alive Pets Store
Completed a 23,160 square foot renovation for Homes Alive Pets, converting a former automotive repair garage into a retail pet store and warehouse.
Honest Physiotherapy Clinic
Conversion of a residential garage into a commercial physiotherapy clinic.
ISL Engineering
high-end interior office renovation featuring new offices, boardrooms, breakout areas, and a kitchenette. The project included custom millwork, electrostatic stair rail painting, and full interior finishes, delivering a modern workspace
Oliver Place
Interior upgrades to a 13-story residential building including lobby modernization, party room renovation, new fitness room, and corridor finishes.
Tetra Tech
completed interior renovations for two occupied buildings totaling 65,000 sq ft in Edmonton. Work included drywall, painting, flooring, millwork, and plumbing fixtures.
ATB Financial Jasper Ave
Engineering coordination, fabrication and installation of mounting components, repairs to existing aluminum mullions, and integration of the signage system with the building’s controls.
ATB Financial Red Deer North
Engineering coordination, aluminum mullion repairs, fabrication of mounting hardware, and installation support for the primary building signage system.
Servus Credit Unions
exterior sign band repairs, facade improvements, and finish upgrades at 25 Servus Credit Union locations across Alberta.