Projects
Best Western Plus
Goldwing completed a full-scale refurbishment of a four-storey, 60,000 sq. ft. hotel tower in Leduc, Alberta, including upgrades to 116 guest suites and the construction of new lobby areas.
Boost Physiotherapy Clinic
Tenant improvement build-out located within the Terwillegar Community Recreation Center in Edmonton, Alberta.
Kingston Ross Pasnak
Interior renovation of a three floor high-end office space. Work completed on time and included custom millwork, Teknion walls, and premium finishes in lounges, meeting rooms, and a bistro.
ISL Engineering
high-end interior office renovation featuring new offices, boardrooms, breakout areas, and a kitchenette. The project included custom millwork, electrostatic stair rail painting, and full interior finishes, delivering a modern workspace
Oliver Place
Interior upgrades to a 13-story residential building including lobby modernization, party room renovation, new fitness room, and corridor finishes.
Tetra Tech
completed interior renovations for two occupied buildings totaling 65,000 sq ft in Edmonton. Work included drywall, painting, flooring, millwork, and plumbing fixtures.
Wayside Inn
Significant interior and exterior modifications, including the removal of an existing office space and the excavation of approximately 20 feet to construct a new elevator shaft extending from the basement through to a rooftop addition.
Jobsite Workwear
installation of structural supports, custom-fabricated steel shelving components, mounting rails, and integrated electrical rough-ins for lighting and display features.
KRP Sunlife
Redevelopment of a sublease office space on the 11th floor of Sun Life Place in Edmonton, AB.
Medisys Clinic
Interior renovation of an existing show suite, transforming the space into a functional and compliant basic care medical facility in Edmonton, Alberta.
Eastview Middle School
Goldwing completed the replacement of the gymnasium ceiling at Eastview Middle School in Red Deer, Alberta.
St. Anne’s
Renovation of a 5-bedroom group home including relocated kitchen, barrier-free washrooms, patient lifts, and full flooring upgrades.
RJC Engineers
Interior office renovation and expansion featuring DIRTT wall systems, new lighting, fire separations, and tenant upgrades.
Edmonton Eye Clinic
Full demolition and reconfiguration of the existing space to support updated clinical operations.
Westlock Aquatic Center
Interior renovation of pool and hot tub resurfacing involving epoxy paint removal, surface prep, waterproofing, and tiling.
Dispensaries Ltd
Development of multiple negative and positive pressure rooms, complete with monitoring systems to meet strict operational and environmental requirements.
SMA Consulting
Full demolition and reconstruction of the main floor office space including glass wall partition systems and open work areas.