2020 - Project Profile - Cash Money - JL
2017 - Project Profile - Wayside Inn - B

Project Profiles

Click on the images to see the full Project Profiles

Westlock Aquatic Centre

Project Summary

  • Removing the epoxy paint.

  • Preparing the pool and hot tub for tiling.

  • Notable scopes of work completed were:

    • Dustless sand blaster and grinders were used to remove the epoxy paint down to concrete finish.

    • Waterproofing membrane were applied prior to tiling.

2020 - Project Profile - SMA Consulting

SMA Consulting

Project Summary

  • Interior renovations: demolition and reconstruction of office space including glass wall partition systems, open work areas, multi-functional work spaces, new finishes in the kitchen and painting throughout.

  • New AV equipment.

  • Exterior upgrades of new custom fabricated metal cladding.

  • HVAC System upgrades and new torched on membrane  flat roof.

2020 - Project Profile - Servus Credit U

Servus Credit Union

Project Summary

  • Exterior sign band repair at 25 locations.

  • Exterior facade repairs.

  • Exterior finishes upgrades.

  • Miscellaneous interior renovations.

2020 - Project Profile - Medysis - PB -

Medysis

Project Summary

  • Interior renovation of an existing show suite into a basic care medical facility.

  • Scope: specialized HVAC system requirements for medical facilities.

  • Specialized electrical outlets.

  • Vaccine fridge electrical outlet tied to buildings uninterrupted power supply so if power goes out the vaccines will remain protected in fridge. 

  • Included occupation testing features such as fitness evaluation space and restrooms.

2020 - Project Profile - Group Homes - P

Catholic Social Services Group Homes

Project Summary

  • Interior renovation of two group homes.

  • Interior scope of work included all new custom millwork with quartz countertops, paint, flooring, lighting, custom millwork for staff office, stainless steel handrails.

  • Exterior scope consisted of new living room window, Hardie board, ledgestone, paint, and exterior concrete, stairs, pad and walkway.

Cash Money

Project Summary

  • Construction of new interior dividing wall to separate a bay for a new tenant space.

  • Notable scopes of work completed:

    • Construct new interior tenant area to have door/frames, ceiling, lighting, power and data distribution, finishes, and millwork.

2019 - Project Profile - Popowich Meat C

Popowich Meat Company

Project Summary

  • Construction of a retail butcher shop.

  • Includes smoke collection hood, office, grease trap, grease interceptor, water heaters.

2019 - Project Profile - Eastview Middle

Eastview Middle School

Project Summary

  • Provide services to replace ceiling in the Gymnasium at Eastview Middle School.

  • Demolish and replace the ceiling, reinstall the sprinkler system and installed owner supplied LED lights.

2018 - Project Profile - ISL - BK - Edit

ISL Engineering

Project Summary

  • ISL was an exciting project to work on.  The space featured many unique features and high-end finishes. 

  • Electrostatic painting of the existing steel stair handrail completed on site.

  • New spaces included offices, boardroom, breakout spaces, kitchenette, and restrooms.

2018 - Project Profile - Homes Alive Pet

Homes Alive Pets

Project Summary

  • 23,160 SF Pet Supply Store.

  • Contained structural component, conversion of existing automotive vehicle repair garage to retail space.

  • Custom display millwork, services for commercial coolers and freezers, conversion/creation of warehouse space.

  • Develop huge warehouse space used to store product for their online sales.

Wayside Inn

Project Summary

  • Constructed addition above the roof to connect the adjacent second floor of hotel suites.

  • Foundation work and construction of a concrete and cement block elevator shaft.

  • Exterior finishing work including: demolition, reconstruction of exterior columns, roof work and decorative eyebrows.

  • Phase two demolition of the existing Banquet Rooms, finishes, removal of a Stair Chair Lift.

  • Upgrades to all interior finishes.

2017 - Project Profile - Packrat Louis -

Packrat Louis Kitchen & Bar

Project Summary

  • Interior and exterior renovation of an existing restaurant.

  • Polished concrete floors.

  • Reclaimed timber feature walls.

  • New bar area featured custom millwork and displays.

2017 - Project Profile - Dispensaries Lt

Dispensaries Ltd.

Project Summary

  • Creation of a state-of-the-art compounding facility and office space.

  • Includes multiple negative and positive pressure rooms with monitoring system.

2017 - Project Profile - Best Western Pl

Best Western Plus Pool

Project Summary

  • Construction of attached indoor Pool.

  • Water slide feature.

  • Interior/exterior tie ins to existing hotel building.

2017 - Project Profile - Barney's Restau

Barney's Restaurant & Lounge

Project Summary

  • Complete demolition and rebuild of the existing lounge interior.

  • Building addition for a VLT Room, mechanical upgrades, new exterior entrance features, and construction of Alberta’s first “beer wall”.

2016 - Project Profile - Kingston Ross P

Kingston Ross Pasnak

Project Summary

  • Three floors of 9888 Jasper Ave. building.

  • 33,000 SF, high-end office space including meeting rooms, bistro, staff lounges.

  • Teknion wall system.

  • Fabric walls.

  • Custom millwork.

2015 - Project Profile - Day’s Inn Airpo

Day's Inn / Airport Inn

Project Summary

  • Complete removal of all interior walls (1 side of all sound walls), plumbing PTACs, exterior skin of building from 116 suites and rebuilding the inside of the building with modern finishes, spray foam insulation, walls, doors, plumbing fixtures, PTACs.

  • Three existing suites were removed to create new lobbies

  • A new elevator was added.

  • Entire exterior was upgraded to new stone, stucco and Hardie Board finishes.

  • Demolition of the existing main entrance and replacement with a new vestibule and Porte Cochere feature.

Challenges & Achievements

  • Extensive effort was expended to be able to control noise and minimize disruption to the ongoing operation of the hotel.

  • All hazards were avoided and there were no serious injuries on this project.

2015 - Project Profile - Tetra Tech - PB

Tetra Tech

Project Summary

  • Interior renovation of two, two-story buildings, with a combined 65,000 square feet.

  • Primary scope included drywall, painting, flooring, millwork, vanities, plumbing fixtures.

12184-152 Street  Edmonton, AB  T5V 1S1