Project Profiles - Full Builds and Additions (scroll Down for Interiors)
Click on the images to see the full Project Profiles
​
West Point Building 8
Project Summary
-
Demolition of an exiting single use building (previously Soda Jerks and Eastside Marios).
-
Full build of a new 9,935 square foot commercial building.
​
Project scheduled
for completion
December 2022!
​
​
Check back then for
the full Project
Profile.
​
​
Schrader Building
Project Summary
-
Construction of a new standalone building.
-
3,000 square foot.
-
Interior build out of a craft brewery and restaurant.
Best Western Plus Pool
Project Summary
-
Construction of new attached indoor Pool.
-
Water slide feature.
-
Interior/exterior tie ins to existing hotel building.
Personnel and Equipment Used
-
Excavation, structural steel, concrete, roofing.
-
Aquatic sub trade specialists.
-
Exterior finishes: stucco, Hardie Board, stone, glazing.
-
Interior finishes: framing/drywall, flooring.
Challenges & Achievements
-
Hotel remained operational during construction. Coordination/safety of guests and staff.
-
Alberta weather was a challenge. Able to adjust, and finish the project on time.
Westlock Gospel Chapel
Project Summary
-
Project Summary
-
Construction of a new standalone building.
-
13,000 square foot.
-
Interior build out of the chapel, junior leadership hall and offices.
Town of Hanna Swimming Pool
Project Summary
-
Construction of a new standalone building.
-
Interior build our of the change rooms, showers, offices and concession.
-
New toddler pool.
-
New lane pool.
-
Diving pool.
-
New spiral waterslide.
Red Deer Toyota
Project Summary
-
Ground up construction of a new 30,000 square foot car dealership and service department.
Project Profiles - Interiors (scroll Up for Full Builds and Additions)
Click on the images to see the full Project Profiles
​
GWL Jasper OnEleven Modernization
Project Summary
-
Retail tenant spaces.
-
Apartment lobby.
-
Plaza.
-
Curtain Wall.
-
Canopy.
Project scheduled
for completion
Summer 2023!
​
​
Check back then for
the full Project
Profile.
GWL Boardwalk Office Build Out
Project Summary
• Scope of work:
o Demolition of two existing washrooms.
o Construction of Demising Walls, Offices, Washrooms, Boardroom.
o Add 6 new exterior windows, door and vestibule.
o New RTU and associated Ductwork.
o All related Electrical
o All related Finishes
o Exterior Chain Link Fence Enclosure
Dispensaries - St. Albert
Project Summary
-
Construct pharmaceutical dispensary.
-
Fire rated shutter to allow for glass double doors to create a welcoming feeling but maintain fire rating of common corridor.
-
Naturopath treatment room.
-
Long term, repeat relationship (built a compounding lab facility for them previously.
-
Circular features (round drop-down bulkheads with feature lighting, semi-circular bulkheads over pharmacy counter line and at waiting area, rounded millwork).
​
Accumen
Project Summary
-
Interior renovation to create a sports clinic.
Includes demolition, roofing, two shower
rooms, heated floors, tile and carpet, laundry
facilities, offices, treatment rooms, and
exercise areas.
Innovative features Heated floors for shower
rooms.
Challenges & Achievements
​
Results Canada
Project Summary
-
• 4,000 square feet office build out.
• Custom design and specialty trades.
Featuring:
o Custom cabinets.
o Value engineered glazing.
o Open ceiling within bistro & reception.
o Sound proofing.
o LED lighting.
​
Oliver Place Main Floor &
Recreation Spaces
Project Summary
• Modernization of the main lobby.
• Renovation of the Party Room.
• Build out of a new Fitness Room.
• New paint and carpet to corridors, 13 stories.
Challenges & Achievements
• A large portion of this project was providing a fresh look to the main lobby of an occupied residential building. Our primary focus was maintaining access, while ensuring the safety and comfort of the residents. We are proud to say we have been welcomed back to perform additional work at this property.
​
GEF Seniors Housing
Project Summary
-
Project Summary
• Interior selective demolition.
• Shower conversation.
• Flooring, painting, millwork, plumbing,
electrical.
Westlock Aquatic Centre
Project Summary
-
Removing the epoxy paint.
-
Preparing the pool and hot tub for tiling.
-
Notable scopes of work completed were:
-
Dustless sand blaster and grinders were used to remove the epoxy paint down to concrete finish.
-
Waterproofing membrane were applied prior to tiling.
-
​
Servus Credit Union
Project Summary
-
Exterior sign band repair at 25 locations.
-
Exterior facade repairs.
-
Exterior finishes upgrades.
-
Miscellaneous interior renovations.
​
Catholic Social Services Group Homes
Project Summary
-
Interior renovation of two group homes.
-
Interior scope of work included all new custom millwork with quartz countertops, paint, flooring, lighting, custom millwork for staff office, stainless steel handrails.
-
Exterior scope consisted of new living room window, Hardie board, ledgestone, paint, and exterior concrete, stairs, pad and walkway.
Popowich Meat Company
Project Summary
-
Construction of a retail butcher shop.
-
Includes smoke collection hood, office, grease trap, grease interceptor, water heaters.
ISL Engineering
Project Summary
-
ISL was an exciting project to work on. The space featured many unique features and high-end finishes.
-
Electrostatic painting of the existing steel stair handrail completed on site.
-
New spaces included offices, boardroom, breakout spaces, kitchenette, and restrooms.
Wayside Inn
Project Summary
-
Constructed addition above the roof to connect the adjacent second floor of hotel suites.
-
Foundation work and construction of a concrete and cement block elevator shaft.
-
Exterior finishing work including: demolition, reconstruction of exterior columns, roof work and decorative eyebrows.
-
Phase two demolition of the existing Banquet Rooms, finishes, removal of a Stair Chair Lift.
-
Upgrades to all interior finishes.
​
Dispensaries Ltd.
Project Summary
-
Creation of a state-of-the-art compounding facility and office space.
-
Includes multiple negative and positive pressure rooms with monitoring system.
​
Barney's Restaurant & Lounge
Project Summary
-
Complete demolition and rebuild of the existing lounge interior.
-
Building addition for a VLT Room, mechanical upgrades, new exterior entrance features, and construction of Alberta’s first “beer wall”.
​
Day's Inn / Airport Inn
Project Summary
-
Complete removal of all interior walls (1 side of all sound walls), plumbing PTACs, exterior skin of building from 116 suites and rebuilding the inside of the building with modern finishes, spray foam insulation, walls, doors, plumbing fixtures, PTACs.
-
Three existing suites were removed to create new lobbies
-
A new elevator was added.
-
Entire exterior was upgraded to new stone, stucco and Hardie Board finishes.
-
Demolition of the existing main entrance and replacement with a new vestibule and Porte Cochere feature.
​
Beacon Place
Project Summary
-
Project Summary
-
Phase 1
-
Scope of work includes development of a main floor amenity space.
-
Construction of a new entrance canopy feature and painting of existing exterior concrete balconies.
-
Phase 2
-
2nd half of building exterior renovation
-
Upgrade of mechanical systems.
-
Additional structural components
-
Metal finishes, balcony & feature detail paint.
Oliver Place Roof Top Patio and Entrance Canopy
Project Summary
-
Project Summary
• 5,000 square foot roof top patio renovation.
• Innovative features:
o BBQ stone feature wall
o 2 large timber constructed pergolas
o Epoxy floor surface -
Challenges & Achievements
• Permits & building code pertaining to using combustible materials within a non-combustible building and achieving fire retardant regulations.
• Structural pool in-fill to expand patio floor space.
• Peaceful, beautiful & private exterior space within downtown.
Centre for Autism Services Alberta
Project Summary
-
• Selective Demolition of interior space of the existing building.
• Construction of office and classroom space includes, Electrical, Mechanical, Flooring, Painting, Doors and Hardware, Ceiling and millwork.
• Replacement of existing RTU units with new.
West Point Building 4
Project Summary
-
Remove existing siding and replace with lux panels.
-
Construct Architectural detail to front façade of the building.
-
Install exterior wall sconce and LED lighting.
-
Work started in May and completed in July.
-
Minor landscaping and concrete work.
Honest Physio Therapy
Project Summary
• Interior selective demolition.
• Shower conversation.
• Flooring, painting, millwork, plumbing,
electrical.
SMA Consulting
Project Summary
-
Interior renovations: demolition and reconstruction of office space including glass wall partition systems, open work areas, multi-functional work spaces, new finishes in the kitchen and painting throughout.
-
New AV equipment.
-
Exterior upgrades of new custom fabricated metal cladding.
-
HVAC System upgrades and new torched on membrane flat roof.
Medysis
Project Summary
-
Interior renovation of an existing show suite into a basic care medical facility.
-
Scope: specialized HVAC system requirements for medical facilities.
-
Specialized electrical outlets.
-
Vaccine fridge electrical outlet tied to buildings uninterrupted power supply so if power goes out the vaccines will remain protected in fridge.
-
Included occupation testing features such as fitness evaluation space and restrooms.
Cash Money
Project Summary
-
Construction of new interior dividing wall to separate a bay for a new tenant space.
-
Notable scopes of work completed:
-
Construct new interior tenant area to have door/frames, ceiling, lighting, power and data distribution, finishes, and millwork.
-
Eastview Middle School
Project Summary
-
Provide services to replace ceiling in the Gymnasium at Eastview Middle School.
-
Demolish and replace the ceiling, reinstall the sprinkler system and installed owner supplied LED lights.
​
Homes Alive Pets
Project Summary
-
23,160 SF Pet Supply Store.
-
Contained structural component, conversion of existing automotive vehicle repair garage to retail space.
-
Custom display millwork, services for commercial coolers and freezers, conversion/creation of warehouse space.
-
Develop huge warehouse space used to store product for their online sales.
​
Packrat Louis Kitchen & Bar
Project Summary
-
Interior and exterior renovation of an existing restaurant.
-
Polished concrete floors.
-
Reclaimed timber feature walls.
-
New bar area featured custom millwork and displays.
​
Best Western Plus Pool
Project Summary
-
Construction of attached indoor Pool.
-
Water slide feature.
-
Interior/exterior tie ins to existing hotel building.
​
Kingston Ross Pasnak
Project Summary
-
Three floors of 9888 Jasper Ave. building.
-
33,000 SF, high-end office space including meeting rooms, bistro, staff lounges.
-
Teknion wall system.
-
Fabric walls.
-
Custom millwork.
Tetra Tech
Project Summary
-
Interior renovation of two, two-story buildings, with a combined 65,000 square feet.
-
Primary scope included drywall, painting, flooring, millwork, vanities, plumbing fixtures.
Project scheduled
for completion
winter 2023.